Customer Case

230TPH C&D Waste Recycling Plant in Thailand

Larger, more obvious rebar is removed by hand; after crushing, an iron separator removes the residual metal.

230TPH C&D Waste Recycling Plant in Thailand

Project Overview

A second Thai C&D site running a higher tonnage than the first: 230 TPH of concrete, brick and demolition sweepings, with rebar and stray steel arriving embedded in the feed.

The SF-580D carries the heavier duty, with magnetic separation pulling ferrous metal out of the stream ahead of the chamber; the SS-7018 grades the cleaned output. The setup is mobile by design - Thai demolition contracts move, and the plant moves with them.

Equipment Used in the Project

This line is built on the impact + screen soft rock configuration. The full machine list, flow and sizing logic are on that page.

Process Focus

Higher-tonnage C&D line with magnetic metal removal ahead of impact crushing and grading.

Site Requirement

230 TPH on unsorted demolition feed, ferrous metal extracted before the chamber, and full track mobility between contract sites.

Project Result

  • Larger pieces of steel reinforcement must be removed beforehand, while any remaining smaller metal fragments are extracted by an iron separator prior to the screening process, ensuring the aggregate remains uncontaminated.
  • Recycled aggregate graded for road construction and backfill contracts.
  • Plant relocated between demolition contracts on its own tracks.

Related Projects

Similar material or similar site conditions.