Project Overview

Guangdong granite is a wear-parts budget with a quarry attached: high hardness, high abrasiveness, feed that starts large. The customer supplies infrastructure projects with strict grading envelopes, so the line had to hold both output shape and liner cost at the same time.

The SE-1060 takes the primary hit, the SY-HP300 multi-cylinder cone finishes the reduction with a chamber set for cubical output, and the SS-7018 closes the grading. High-chrome wear packages were specified up front for the cone, because in granite the liner conversation decides the project economics.

Equipment Used in the Project

This line is built on the jaw + cone hard rock configuration. The full machine list, flow and sizing logic are on that page.

Process Focus

Jaw primary, multi-cylinder cone secondary and final screening, with high-chrome wear packages specified for abrasive granite.

Site Requirement

Hold 200-220 TPH on abrasive granite, produce 0-5mm, 5-13mm and 13-31.5mm finished sizes, and keep liner cost survivable.

Project Result

  • Stable 200-220 TPH held through granite duty.
  • High-chrome liners extended change-out intervals in abrasive feed.
  • Finished grading accepted for road, rail and structural concrete supply.