Customer Case

Mobile Crushing Line for Iron Ore Mining in Mohe

An iron ore train engineered for Mohe's minus-40 mornings: cold-rated hydraulics, starting aids and roughly 1,800 tons a day.

Mobile crushing line for iron ore mining in Mohe

Project Overview

Mohe is China's coldest county - winter nights near minus 40 degrees Celsius, where an engine that will not start is a lost production day and hydraulic oil that gels is a line-down event. The iron ore operator needed a crushing train engineered for those mornings, not just for the ore.

The answer was a specification rather than a single part: cold-rated hydraulic fluids, low-temperature starting aids on every engine, seals and hoses rated for deep frost. On that foundation, the SE-1060, SY-HP300 and SS-7018 train reduced ore to three sizes through the winter season.

Equipment Used in the Project

This line is built on the jaw + cone hard rock configuration. The full machine list, flow and sizing logic are on that page.

Process Focus

Cold-engineered jaw-cone-screen train for iron ore, specified for reliable starts near minus 40 degrees Celsius.

Site Requirement

Guaranteed cold-weather starting, frost-rated hydraulics and seals, and steady daily tonnage through a long winter mining season.

Project Result

  • Roughly 1,800 tons of ore processed per day through winter operation.
  • Cold-start package delivered dependable morning startups at extreme temperatures.
  • Ore sized into 0-10mm, 10-25mm and 25-40mm fractions.
  • Each machine carries the standard 18-month machine-body warranty, counted from commissioning.

Related Projects

Similar material or similar site conditions.

Ask About This Project

No two sites are identical. Describe yours in three facts (rock, maximum lump, target rate) and we will tell you exactly which part of this configuration would change.

Send Your Specs