SE-1160 Mobile Jaw Crusher

Built for heavy-duty crushing

The SE-1160 is the largest tracked jaw we build: an 1160 chamber taking 800 mm feed, 220–380 t/h, 132 kW on the crusher with a 100 kW engine, 48 t. It is for operations where the blast pattern produces genuinely coarse rock and a 700 mm opening would mean a hammer on standby for half the shift.

SE-1160

Mobile Jaw Crusher

Capacity
220–380 t/h
Max feed
800 mm
Discharge range
0–250 mm
Crusher / screen
1160 jaw crusher
Crusher power
132 kW
Total power
168.9 kW
Engine power
100 kW / 280 kWDP
Machine weight
48 t / 50 tDP
Working dimensions
15,150×6,250×3,850 mm
Transport dimensions
15,000×3,150×3,850 mm

Watch the SE-1160 in Action

A short walk-around filmed on a customer site — feeding, crushing and discharge, so you can see how the machine actually runs before you shortlist it.

Watch more videos

Applicable Materials & Applications

Hard-rock primary

Basalt and granite blasted to a coarse pattern.

High-tonnage contracts

220–380 t/h from a single tracked chassis.

Abrasive gravel

Compression crushing keeps wear off a hammer-type primary.

The jump from 700 to 800 mm is not cosmetic. On a hard-rock bench, the oversize that will not pass a 700 mm opening is the material that stops the plant, and every stop costs more than the extra tonnage the bigger jaw could ever buy. The SE-1160 removes that bottleneck at the face rather than at the hopper, and its 0–250 mm setting range still leaves room to feed a cone at a workable ratio.

At 48 t it remains a single-load move, and the plant carries its own feeder, pre-screen, magnet and discharge belt. For contract work on hard rock — granite, basalt, abrasive gravel — the combination of a wide opening and a 132 kW drive means the chamber is fed at capacity instead of being nursed, which is where the wear cost per tonne actually comes down.

How the SE-1160 Works

An 800 mm opening lets the chamber swallow rock that would otherwise have to be broken twice. The moving jaw runs on an eccentric shaft and closes against the fixed plate once per revolution; the toggle holds the kinematic geometry and protects the frame. Deep chamber sides mean the stone is reduced over a long travel, so the reduction is gradual and the plates wear evenly rather than being gouged at the top.

Setting is at the discharge opening, 0–250 mm. Running wide gives maximum tonnage and a coarse product for a secondary; running tight gives a finished sub-base but costs throughput. On a machine this size the setting is also a wear decision: a chamber that is fed properly, at full load, produces a better-shaped product than one that is run half-empty to protect the plates.

Power, Emissions & Support

Single Power

Requires external power supply

Dual Power

Built-in generator, diesel driven

Emission Standards

China III / IV · EPA Tier 4 / Euro V

Service & Support

18-Month Warranty · Installation & Training · Remote Diagnostics · Spare Parts Supply

Where the SE-1160 Fits

Crushing lines it runs in

How this machine is paired with the rest of the plant, and what changes when the feed changes.

Documents & service

Specification sheets, the 18-month warranty terms and answers to the questions buyers ask first.

SE-1160 FAQ

The four questions buyers ask first about this machine - answered from the spec sheet, the cases library and the service programme.

When is the 800 mm opening worth paying for?

When the rock arrives coarse enough to bridge a 700 mm chamber. Secondary blasting or a hydraulic breaker on every oversize boulder costs more per ton than the extra chassis, and the 1160 takes 800 mm at 220–380 t/h on 168.9 kW installed.

Which cone matches the SE-1160 downstream?

The HP400. The 1160 produces 220–380 t/h and the HP300 tops out at 300 t/h, so a 300 would become the bottleneck; the 400 cone is rated 220–380 t/h on the same band, which keeps the secondary able to clear the primary.

What happens when un-crushable material enters the chamber?

The jaw uses a toggle-based relief path: un-crushable objects pass through instead of destroying the frame, and the chamber clears without a lengthy stoppage. The specific protection configuration of the SE-1160 is listed in the spec table above.

What does lead time look like for a jaw plant like the SE-1160?

Standard build is 20 working days after deposit, before inland transport and sea freight; custom configurations are scheduled at drawing confirmation. Because jaw frames are weld-heavy, we load-test the complete plant before dispatch. The machine carries an 18-month body warranty from commissioning or 3,000 operating hours, whichever comes first.

SE-1160 Product Parameters

Specifications may vary depending on final configuration and project requirements. A dash or blank means the parameter is not listed for this model.

Feeding equipment
Feeding capacity220–380 t/h
Maximum feeding size700 mm
Feeding height3,800 mm
Hopper volume6 m³
Vibrating feeder (L×W)4,150×1,200 mm
Motor modelPJMV-65-6
Power4.5 kW×2
Jaw crusher
Crusher model1160 jaw crusher
Feed inlet (L×W)1,160×800 mm
Maximum feed particle size800 mm
Crusher weight23 t
Discharge range0–250 mm
Main bearing model23060
Main motor modelYE3-132L-6
Crusher power132 kW
Main belt
Stacking height2,900 mm
Length × width10,600×1,350 mm
Electric roller modelM1-270
Power9.2 kW×2
Tail belt
Stacking height2,450 mm
Width800 mm
Electric roller modelM1-270
Power5.5 kW
De-ironing separator
Length × width2,100×910 mm
Power4 kW
Complete machine
Engine power100 kW / 280 kWDP
Track chassis modelLDZ55-3657
Whole machine weight48 t / 50 tDP
Processing capacity220–380 t/h
Total power of crushing operation168.9 kW
Working dimensions (L×W×H)15,150×6,250×3,850 mm
Transportation dimensions (L×W×H)15,000×3,150×3,850 mm
Get a Quote

Request A Quote

Tell us your raw material, required capacity, feeding size and final output size. Our engineer will recommend the suitable model for your project.

Product: SE-1160 Mobile Jaw Crusher